{"id":89,"date":"2020-12-15T07:31:49","date_gmt":"2020-12-15T07:31:49","guid":{"rendered":"https:\/\/goc2020.govmu.org\/oidc\/?page_id=89"},"modified":"2021-01-12T10:22:12","modified_gmt":"2021-01-12T06:22:12","slug":"projects-2012-2013","status":"publish","type":"page","link":"https:\/\/oidc.govmu.org\/oidc\/?page_id=89","title":{"rendered":"Projects 2012 &#8211; 2013"},"content":{"rendered":"<p>[vc_row][vc_column css_animation=&#8221;slideInRight&#8221;][vc_column_text]<\/p>\n<ol>\n<li style=\"margin-bottom:20px;\"><strong>Construction of three quarters \u2013 1100 sq.ft \u2013 two on North Island and One on South Island<\/strong><br \/>\nThe contract was awarded in November 2011 and works started in December 2011.<br \/>\nIn May and July 2012, two of the buildings were completed at 100% and is actually occupied by our employee.<br \/>\nThe third building could not be completed due to lack of building materials, especially purlins and roofing sheets which returned in Mauritius in February 2012,\u00a0has been completed in October 2013.<br \/>\nThe overall cost of the projects was Rs 3.9 million including labour cost and building materials.<\/li>\n<li style=\"margin-bottom:20px;\"><strong>Renovation of three quarters at South Island<\/strong><br \/>\nThe labour cost of the project was Rs 465,000 and the contract was awarded in March 2012.<br \/>\nThe first building of 2400 sq.ft has already been renovated at 100% and already delivered to occupant.<br \/>\nDue to work that was in progress in second building, it was decided not to proceed with the third building as it was not cost effective<\/li>\n<li style=\"margin-bottom:20px;\"><strong>Construction of Refugee Centre at South Island<\/strong><br \/>\nThe Contract was awarded in August 2012.<br \/>\nThe budget for this project is Rs 11 million spread over 2 years \u2013 2011 and 2012.<br \/>\nThe foundation works were completed in October 2012 and block making started as soon as building materials reached South Island.<br \/>\nWorks are in progress, columns have already been casted and laying of blocks have started in March 2013.<br \/>\nSo far the building is at 55% completed; works are expected to be completed in July 2014.<br \/>\nDelay is due to the backfilling.<\/li>\n<li style=\"margin-bottom:20px;\"><strong>Construction of two Duplexes \u2013 North Island<\/strong><br \/>\nA sum of Rs 2.9 million was budgeted for the construction of the two duplexes at North Island.<br \/>\nThe letter of award was issued in August 2012 and works started in September 2012.<br \/>\nConstruction is completed as at date.<\/li>\n<li style=\"margin-bottom:20px;\"><strong>Repairs of jetty at La Fourche Village<\/strong><br \/>\nFollowing a report received from the Resident Manager on the condition of the jetty at Agalega, it was noted that the jetty needed immediate repairs especially for the November 2012 voyage.<br \/>\nViews of a Geotechnical engineer was sought where appropriate recommendations were made.<br \/>\nThe local labour force on the island were entrusted the works and the repairs had been carried out.<br \/>\nSuch works is of a short term basis and it is envisaged to construct a new jetty.<\/li>\n<li style=\"margin-bottom:20px;\"><strong>Construction of an Office Block at La Fourche Village<\/strong><br \/>\nWith the local labour force on the island, a new office block of 150sq.ft had been constructed with concrete walls and iron sheets roofing.<\/li>\n<li style=\"margin-bottom:20px;\"><strong>Upgrading of Toilet Block and Store + Fencing \u2013 Agalega Primary School, North island<\/strong><br \/>\nRepresentations were received from staff of the Ministry of Education and H R to upgrade the toilet block at North Island.<br \/>\nThe works have been entrusted to our local masons and same have been completed in mid-August 2013.<\/li>\n<li style=\"margin-bottom:20px;\"><strong>Construction of a Fuel Shed for Jet A1 at Airport Compound<\/strong><br \/>\nFollowing various suggestions made by the National Coast Guard regarding the condition of storing Jet A1 fuel on the island, it was decided to construct a proper well ventilated store to house the drums to avoid contamination.<br \/>\nA fuel shed for Jet A1 has already been completed at the airport compound to store some 100 drums of Jet A 1 drums.<\/li>\n<li style=\"margin-bottom:20px;\"><strong>Leisure Park at Agalega<\/strong><br \/>\nThe Employees Welfare Fund is financing the project to the tune of Rs 1 million.<br \/>\nThe works have been entrusted to the local people on the islands.<br \/>\nMaterials and equipment have already been shipped to the island. The works are in progress as actual date.<\/li>\n<li style=\"margin-bottom:20px;\"><strong>Fish \u2018Berri Rouge\u2019 at North Island in normal water<\/strong><br \/>\nIn November 2012 voyage, a batch of 500 juvenile \u2018berry rouge\u2019 donated by the Ministry of Fisheries were sent to Agalega to be reared in \u2018Bassin Cappuccin\u2019 at North Island.<br \/>\nA second batch of 200 was sent in June 2013.<\/li>\n<\/ol>\n<p>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column css_animation=&#8221;slideInRight&#8221;][vc_column_text] Construction of three quarters \u2013 1100 sq.ft \u2013 two on North Island and One on South Island The contract was awarded in November 2011 and works started in December 2011. In May and July 2012, two of the buildings were completed at 100% and is actually occupied by our employee. The third building [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"ngg_post_thumbnail":0,"footnotes":""},"class_list":["post-89","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/oidc.govmu.org\/oidc\/index.php?rest_route=\/wp\/v2\/pages\/89","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/oidc.govmu.org\/oidc\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/oidc.govmu.org\/oidc\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/oidc.govmu.org\/oidc\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/oidc.govmu.org\/oidc\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=89"}],"version-history":[{"count":3,"href":"https:\/\/oidc.govmu.org\/oidc\/index.php?rest_route=\/wp\/v2\/pages\/89\/revisions"}],"predecessor-version":[{"id":391,"href":"https:\/\/oidc.govmu.org\/oidc\/index.php?rest_route=\/wp\/v2\/pages\/89\/revisions\/391"}],"wp:attachment":[{"href":"https:\/\/oidc.govmu.org\/oidc\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=89"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}